Kitimbwa mini-piped solar water pumping scheme
Consultancy services for System engineering design, procurement and construction supervision and training for the mini-piped solar water pumping scheme at Kitimbwa, Kayunga district. Services offered: solar resource assessment, water resources assessment, socio-economic survey, engineering surveys and designs, tender documentation, Construction supervision,capacity Building
-
Buseruka HPP Commissioning and Synchronization
ASTER Integral was contracted by Hydromax Limited developers of the 9MW Buseruka Hydro Power Plant to offer technical assistance and engineering expertise for the commissioning of power plant, synchronization of plant, and 33kV power line and interconnection at Kinubi Power substation for the Buseruka HPP project. (year 2011-2012)
-
Waki HPP-Power market studies and Load-flow Analysis
Consultancy services for baseline studies, energy demand in region, peak power demand, and conducting a load-flow analysis for the 4.5MW Waki hydropower project – (year2012-Completed)
-
Hybrid Power system for NILE SEC Campus
Consultancy services for Energy audit, System design and engineering services, plus tendering and construction supervision and training for the power supply improvement and UPS power system for the Nile-SEC campus of Nile-Basin Initiative. (year2011-2012)
-
33kV power transmission line for 9MW Buseruka HPP
Consultancy services to conduct Baseline Survey, Design and EIA for 33kV power transmission line and environs from the 9MW Buseruka Hydro Power Plant. We also provided services for review and update of the ESIA for the Dam Site and Power plant. (year2008-2010)
-
Hydropower Feasibility Study-Hydrological analysis and power/energy estimations
Consultancy services for feasibility and hydrological studies of the proposed mini-hydropower projects located on river Mitano, Esia and Ndugutu; including plans for interconnecting/evacuation power lines to the national grid. (year2010-2011)
-
9MW Buseruka HPP
Network studies and voltage and transient stability studies including technical assistance in plant commissioning and interconnection to the national grid at Kinubi-Hoima substation plus development of proposals for for grid stability and reliability to take-up the 9.0MW power to be generated at Buseruka HPP (year 2013)
-
4.5MW Waki HPP-Interconnection design, Network study, Load-flow Analysis, Transient and Dynamic study
Consultancy services for engineering design of the HPP interconnection power line, network study, loadflow analysis including transient and dynamic stability study analysis for the 4.5MW Waki hydropower project. We are also providing technical assistance for PPA negotiations and Licensing process of the power plant – (year-2014 Completed)
-
Waki HPP-Power market studies and Load-flow Analysis
Consultancy services for baseline studies, energy demand in region, peak power demand, and conducting a load-flow analysis for the 4.5MW Waki hydropower project [wp-is3dphoto]
-
Hydropower Feasibility Study-Hydrological analysis and power/energy estimations
Consultancy services for feasibility and hydrological studies of the proposed mini-hydropower projects located on river Mitano, Esia and Ndugutu; including plans for interconnecting/evacuation power lines to the national grid