Engineering, Monitoring, Evaluation and audvisory services for Norwegian Government financed 220 KV/132 KV power transmission, 33KV power distribution and 200 MW Isimba HPP – Ongoing |
Uganda |
KPMG/MFA Norwegian Embassy in Uganda |
Independent Verification Agent for OBA Customer Service Connections; Independent verification Agent for World Bank financed OBA Project for customer service connections, implemented by UMEME- concessionaire for 33 kV power distribution grid. Ongoing |
Uganda |
KPMG/REA |
Maintenance framework contract for backup technical support to water schemes using Solar-PV water Pumping systems in Uganda: consultancy services for technical support to monitoring and o&m management in the repair and replacement of system components of solar powered water supply systems under the ert (water component) in uganda; commissioned by MWE/DWD-Urban Water. JWTL is providing technical backup support for O&M organization and management, including Condition based observation and monitoring of solar water pumping schemes, as well as Monitoring and supervision of the framework contractor for supply, maintenance and replacements; plus training and capacity building of scheme operators/technicians/MWE engineers and institutional support. Ongoing |
Uganda |
MWE |
Waki HPP: Network studies and voltage and transient stability studies, including study of the interconnection arrangements to the national grid, as well as developing proposals for grid stability and reliability to take-up the 4.5MW power to be generated at Waki HPP-Ongoing. |
Uganda |
HYDROMAX (NKUSI) LTD |
15MWp Solar Power Plant: Feasibility and Environment impacts assessment of grid conneted 15 MWp solar plant at Bufulubi – Mayuge. (2014-Ongoing) |
Uganda |
EMERGING POWER FZC |
635kWp Hybrid Solar power plant: Construction superision of the Kalangalaa 635 kWp Hybrid solar power plant at Bugala Island lake Victoria – Sub contracted by NEWPLAN LTD. Services offered included; geo-physical studies, socio-economic survey, engineering surveys and designs, environmental impacts, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training of water boards and private operators, information dissemination. (2013-Ongoing) |
Uganda |
NEWPLAN/KIS-INFRACO |
Solar Powered mini-piped water supply schemes: Consultancy services for Technical Planning, Design and Construction Supervision of Solar powered piped water supply and sanitation schemes in 60 districts of Uganda project financed by the African Development Bank. Services offered included; solar resource assessment, geo-physical studies, water resources assessment, socio-economic survey, engineering surveys and designs, tender documentation, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training of water boards and private operators, information dissemination. (March 2013-Ongoing) |
Uganda |
MWE |
Solar Water Pumping Systems under Energy for Rural Transformation: Consultancy services for implementation support of the Energy for Rural Transformation Project ERT-II water project for 41 water supply and sanitation water schemes financed by the World Bank/ IDA and NDF. Services offered included; solar resource assessment, geo-physical studies, water resources assessment, socio-economic survey, engineering surveys and designs, tender documentation, environmental impacts, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training of water boards and private operators, information dissemination. (September 2010-Ongoing) |
Uganda |
MWE |
Buseruka HPP: Network studies and voltage and transient stability studies including technical assistance in plant commissioning and interconnection to the national grid at Kinubi-Hoima substation plus development of proposals for for grid stability and reliability to take-up the 9.0MW power to be generated at Buseruka HPP –Completed. |
Uganda |
HYDROMAX |
Buseruka HPP: Consultancy services to conduct Baseline Survey, Design and EIA for 33kV power transmission line and environs from the 9MW Buseruka Hydro Power Plant. Services offered included; geo Geo-physical studies, socio-economic survey, engineering surveys and designs, tender documentation, environmental impacts, capacity Building, Institutional Support. (2011-Completed) |
Uganda |
HYDROMAX |
Hybrid Power system for NILE SEC Campus: Consultancy services for Energy audit, System design and engineering services, plus tendering and construction supervision and training for the power supply improvement and UPS power system for the Nile-SEC campus of Nile-Basin Initiative. Services offered included; engineering surveys and designs, tender documentation, environmental impacts, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training and information dissemination. (2011) |
Uganda |
NILE-BASIN INITIATIVE |
Institutional Hybrid Solar System at Kampala Kolping Hotel: Consultancy services for System Design, procurement, installation and training for the Hybrid automated and building integrated 9x130Wp Solar PV system for Kolping Hotel in Kampala Services offered included; engineering surveys and designs, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training and information dissemination. (2012-completed) |
Uganda |
KOLPING SOCIETY |
Buseruka HPP Commissioning and Synchronization: JW Technologies Limited was contracted by Hydromax Limited developers of the 9MW Buseruka Hydro Power Plant to offer technical assistance and engineering expertise for the commissioning of power plant, synchronization of plant, and 33kV power line and interconnection at Kinubi Power substation for the Buseruka HPP project. |
Uganda |
HYDROMAX |
Institutional Hybrid Solar System at Kolping Office-Hoima: Consultancy services for System Design, procurement and installation supervision and training for the Hybrid automatic 72x120Wp Solar PV system for Kolping society offices in Hoima. Services offered included; engineering surveys and designs, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training and information dissemination. (2011-Completed) |
Uganda |
KOLPING SOCIETY |
Hydropower Feasibility Study-Hydrological analysis and power/energy estimations: Consultancy services for feasibility and hydrological studies of the proposed mini-hydropower projects located on river Mitano, Esia and Ndugutu; including plans for interconnecting/evacuation power lines to the national grid. (Completed) |
Uganda |
AFRICAN POWER INITIATIVE/UNIDO |
4.5 MW Waki HPP-Power market studies and Load-flow Analysis: Engineering design of interconnection power line, Power market study, Landflow analysis, Network and Transient stability analysis for the 4.5MW Waki hydropower project – (Completed) |
Uganda |
HYDROMAX (NKUSI) LTD |
Environmental impact assessment for the quarry at Masindi: Consultancy services for EIA involving identification of environmental aspects and field investigations including assessment and analysis . The services offered include: Description of Physical and Biological Environment, Social Environment, Legal and Institutional Aspects, Environmental Impacts, Mitigation Measures, Monitoring and Recommendations |
Uganda |
DOTT Services Ltd |
Environmental impacts audit for the quarry at Ssemuto: Consultancy services for EIA involving environmental aspects and field investigations including assessment and analysis. The audit and environment monitoring activities include: monitoring the physical and biological Environment (current state versus previous); description of Social Environment (current state versus previous); legal and Institutional Aspects regarding mitigation measures and effectiveness of interventions taken; environmental Impacts (air and noise pollution) mitigations and their effectives; Mitigation Measures, Monitoring and Recommendations for Project affected persons |
Uganda |
DOTT Services Ltd |